八八字典>英语词典>deformations翻译和用法

deformations

英 [ˌdiːfɔːˈmeɪʃənz]

美 [ˌdifɔrˈmeɪʃənz]

n.  损形; 变形; 畸形; 破相; 变丑; 残废
deformation的复数

柯林斯词典

  • V-ERG (使)变形;(使)成畸形;损毁…的外形
    If somethingdeformsa person's body or something else, it causes it to have an unnatural shape. In technical English, you can also say that the second thingdeforms.
    1. Bad rheumatoid arthritis deforms limbs...
      严重的类风湿性关节炎会造成四肢变形。
    2. ...the ability of a metal to deform to a new shape without cracking.
      金属重新塑形而不断裂的能力

双语例句

  • In this paper, the general phenomenon about subsidence and deformations of surface in subway construction is illustrated.
    阐述了城市地铁施工过程中,地表沉陷与变形的一般现象,探讨了地表沉降指数函数计算公式。
  • Stress concentrations due to prestressing or other loads and to restraints or imposed deformations shall be considered.
    应考虑预加应力或其它荷载以及限制或施加变形引起的应力集中。
  • Then the door deformations in X and Y directions are analyzed with both theoretical and real gaps.
    分别对车门在理论间隙和实测间隙下的Y向变形、X向变形进行分析。
  • The deformations of aerated concrete block in varied initial moisture content and environment were mainly studied.
    研究了不同初始含湿量及在不同环境中的加气混凝土砌块的变形行为。
  • This paper studied the forming mechanisms of the Qiyang arcuate structure through regional tectonic evolutional setting and characteristics of structural deformations.
    结合区域构造演化背景及构造变形特征,对祁阳弧形构造的形成机制进行研究。
  • And plane finite element method is used to simulate excavation process and calculate the corresponding deformations.
    应用平面有限元法模拟基坑开挖过程计算出各工况的变形值,与基坑实测变形进行对比分析;
  • The P-stability for deformations of a straight elastic rod in gripper structure is studied.
    研究抓握结构中弹性棒变形的P-稳定性。
  • This measurement is independent of the ball screw features ( diameter and lead) and its deformations.
    这种测量方法是独立滚珠丝杠功能(直径和铅)和其变形。
  • Dial gauges, gridding lines and digital camera were used to monitor quantitatively and write down qualitatively the deformations and displacements of the models.
    采用百分表、网格线和数码相机,对模型的变形和位移进行监测和记录。
  • Cables'force, strain of beams and columns and structural deformations are all monitored.
    监测内容包括索力监测、梁柱应变监测以及结构变形监测。